Website update: EN1366.co.uk is currently under construction. Guidance pages are being reviewed and expanded.

EN1366.co.uk

Request a Project Review

Tell us what the specification requires and what information is available. DuctFix can then discuss the practical ductwork route with you.

Useful information to provide

  • Project specification and relevant drawings
  • Intended ductwork use and route
  • Required fire-resistance or smoke-control classification
  • Dimensions, orientation and pressure requirements
  • Selected system evidence or named manufacturer, if any
  • Whether the enquiry is for manufacture, supply, installation or an initial discussion

Tell us about the project

This questionnaire helps DuctFix understand the proposed ductwork route, smoke fan duty, performance and evidence before an initial discussion. Complete what you know and choose “Not sure” where you need help.

You do not need to know every answer. The form is designed to identify the questions that still need resolving.

1. Your details

2. Project and system

3. Required performance

Enter the project requirement rather than assuming a standard classification. Leave optional fields blank if they have not yet been decided.

4. Route, construction and evidence

5. System-specific questions